The ARISS Technical Team (Mike K1NPT, Jeff KA1NGP, and Bob WB4SON) presented their initial technical proposal to the ARISS mentor this afternoon and received positive initial feedback.
A couple of tweaks will be required to the equipment list to optimize things (two complete stations must be provided and the RF requirements are pretty high for both the TX and RX paths to ensure a horizon to horizon contact). Plus the audio/visual details still need development.
The goal is to have the proposal submitted within the next week or so.